As part of the 2018 – CIV1499 Summer “Tunnelling and Urban Excavation” course, a site visit was carried out to the Metrolink tunnel and Station on Avenue Road. The visit took place on June 23, 2018 and was organized by Crosslinx Transit Solutions – Constructors (CTSC) and Giuseppe Gaspari (PEng).
The visit comes to add a practical perspective to the course and to the industry driven lectures delivered by Giuseppe Gaspari (PEng). The visit commenced with a 15-minute safety orientation meeting for the attendees. Following that, the group went on an hour-long site tour of the Avenue Construction Site.